EU EED 2023/1791 & Delegated Regulation 2024/1364 — data centre reporting
The first report was due in September 2024. Subsequent reports are due annually, each May, covering the preceding calendar year.
Data centre owners and operators in the EU at or above the 500 kW IT power threshold, including colocation providers reporting on behalf of tenants where applicable.
A facility thermal model capable of producing PUE under representative load and ambient conditions, and identifying recoverable waste heat streams (temperature, flow rate, availability) to support the waste-heat section of the report.
This evidence is typically produced from a facility-level thermal digital twin built from the existing rack and room models.
Building or extending a facility-level digital twin for recurring PUE and waste-heat reporting is available as a paid ROIfast™ engagement.
Is your next qualification affected?
Tell us about your program and we'll help map it to the evidence this standard requires. Engineering work is delivered as a paid ROIfast™ engagement.